Autostrada · 2025
Mykolaiv Water Pipeline
A promo landing for the pipeline Autostrada built for Mykolaiv, a city that went without drinking water for over three years. The story runs from cause to technology.

- Client
- Autostrada
- Platforms
- Web
- Year
- 2025
The project in figures
67.8km
of new trunk pipeline from Nova Odesa to Mykolaiv
- 120,000 m³
- daily capacity
- +50,000 m³
- irrigation capacity
- 2,000+
- workers on the project
- 1,000+
- units of construction machinery
Figures from vodogin.autostrada.ua — the landing sets them in one row right under the main photo.
Route map
From Nova Odesa to Mykolaiv
Instead of an ordinary map, a stylised diagram. The silver pipe runs right across Mykolaiv region, and a small map in the corner shows where it is in Ukraine.


Context
A city on salt water
The landing starts with the cause. In April 2022 the pipeline that supplied Mykolaiv was blown up, and for more than three years the city relied on estuary water unfit for drinking.
Pace
Counted in months
Two large figures compare Autostrada’s timeline with the usual one for projects like this. The explanation sits next to them: designers and builders work in parallel under the Design&Build model.

Interactive
A pipe you can look into
The specs sit right on the image: 800–900 mm diameter, up to 16 atmospheres of pressure, corrosion resistance. On the right are the benefits, including a service life of over 50 years.

Technology
Under the Inhul
A dedicated section covers the horizontal directional drilling under the river: the method protects the banks and the ecosystem.

Desktop and mobile
Two languages. Two screens.
The landing is designed in Ukrainian and English, for desktop and phone. On mobile the figures wrap into two columns, and the map and the pipe keep their labels.