Mykolaiv Water Pipeline · 2025

We told the story of 67.8 km of pipeline for Mykolaiv

We designed and built the landing page for the pipeline Autostrada built for a city that went without drinking water for over three years. The page goes from the cause to the figures and the technology.

A stork above the pipeline at sunset, the landing’s main photo
Client
Autostrada
Platforms
Web
Year
2025

The project

A big project in plain words

Challenge

Explain why Mykolaiv needed a new pipeline, where the route runs, how fast it was built and with what technology.

What we did

We designed the landing’s storyline, a stylised route map, an interactive pipe with its specs, and Ukrainian and English versions for desktop and phone. Then we built the landing.

Outcome

The landing is live at vodogin.autostrada.ua in Ukrainian and English.

Services
  • UX/UI design
  • Storyline and structure
  • Two language versions
  • Mobile version
  • Landing page development

The project in figures

67.8km

of new trunk pipeline from Nova Odesa to Mykolaiv

120,000 m³
daily capacity
+50,000 m³
irrigation capacity
2,000+
workers on the project
1,000+
units of construction machinery

Figures from vodogin.autostrada.ua, where the landing sets them in one row right under the main photo.

Route map

From Nova Odesa to Mykolaiv

We replaced an ordinary map with a stylised diagram: the silver pipe runs right across Mykolaiv region, and a small map in the corner shows where it is in Ukraine. The scale is clear in a second.

Pipeline route map on the landing page
A pipe section lowered at sunset, a photo from the landing

Context

A city on salt water

The landing starts with the cause. In April 2022 the pipeline that supplied Mykolaiv was blown up, and for more than three years the city relied on estuary water unfit for drinking.

Pace

Counted in months

Two large figures set Autostrada’s timeline against the usual one for projects like this, with the reason right beside them: designers and builders work in parallel under the Design&Build model.

5months of work for Autostrada
+2.5years is the usual time for such projects
Excavators at the pipeline trench, a photo from the works chronicle

Interactive

A pipe you can look into

We put the specs right on the image: 800–900 mm diameter, up to 16 atmospheres of pressure, corrosion resistance. The technical data reads without tables, and on the right are the benefits, including a service life of over 50 years.

The pipe with hotspot labels on the landing

Technology

Under the Inhul

A dedicated section covers the horizontal directional drilling under the river: the method protects the banks and the ecosystem.

462mlength of the river crossing
14mdepth of the pipe
The pipeline route from above, a photo from the Technology section

Desktop and mobile

Two languages, two screens

We designed and built the landing in Ukrainian and English, for desktop and phone. On mobile the figures wrap into two columns, and the map and the pipe keep their labels.